real estate radon testing
Most people meet radon for the first time on an inspection report, with a date attached. The Colorado purchase contract runs inspection and objection on fixed deadlines, and those deadlines do not move because a contractor is busy. That changes what matters about the work: the measurement itself is the same 48 hours it always is, but the scheduling, the paperwork and the willingness to say “no, we cannot make that date” before you commit are what actually protect the transaction. We would rather turn a job down on Tuesday than miss an objection deadline on Friday.
Radon in a transaction is not a technical problem, it is a scheduling one. The measurement takes the same 48 hours it always does. What changes is that the Colorado purchase contract runs inspection and objection on fixed dates, those dates do not move because a contractor is busy, and everything downstream of the result — a quote, an install, a retest, a document in the file — has to fit inside them. So the first question we ask is your objection date, and if we cannot make it we would far rather say so on the phone than take the booking and find out on Friday.
In a transaction the result has to convince somebody who is on the other side of a negotiation from you. A continuous monitor logs hourly and records movement and sudden ventilation changes, which means a result can be defended if it is questioned. A charcoal kit sitting on a shelf in a house that is being shown three times a day cannot. The monitor is not more accurate in some laboratory sense; it is more accountable, and accountability is what a transaction is buying.
This is the practical headache. Closed-house conditions and an open house are contradictory instructions, and the listing agent, the seller and anyone with lockbox access all need to know a test is running. We put a notice on the monitor. It is not enforcement, but it converts an argument later into a conversation now, and combined with tamper logging it usually keeps the result clean.
Test it anyway. This is the case most often skipped and it is the one that costs money. A system on the wall proves somebody installed a pipe at some point, not that the house reads low today. Fans fail silently and nobody notices; gauges go unread for a decade; an addition gets built over the original suction point. A short test either confirms it is doing its job or finds a dead fan while it is still the seller's problem rather than yours.
Whether the seller mitigates, whether there is a credit at closing, or whether the buyer takes it on is negotiated between the parties with their agents. We do not have a view on that and we will not pretend to. What we can do is give you a real number quickly, which is usually the piece everyone is waiting on, and then install a system and retest it fast enough that the file closes with a documented before and after.
How long does it take? 48 hours of measurement. Where a system is needed inside the same window, most installs go in within a day once scheduled — the constraint is the calendar, not the work.
These usually come up in the same conversation:
A continuous monitor in the lowest lived-in level for 48 hours, logging hourly — so you get a curve you can read, not one number that might have been a fluke.
Learn More →The standard fix for a Denver basement or slab-on-grade: suction under the floor, every gap sealed, a fan, and the discharge above the roofline.
Learn More →A second test after the system has been running. Included with every install, and available on its own for a system nobody has ever checked.
Learn More →Free · No Obligation
Send a few details and we will call you back to book a free on-site estimate.
We will call you shortly to book the estimate. Need us sooner? (720) 677-9523
Something went wrong sending your request — please call (720) 677-9523 and we will take the details over the phone. Your answers are still filled in below.