real estate radon testing

Real Estate Radon Testing in Denver, CO

Most people meet radon for the first time on an inspection report, with a date attached. The Colorado purchase contract runs inspection and objection on fixed deadlines, and those deadlines do not move because a contractor is busy. That changes what matters about the work: the measurement itself is the same 48 hours it always is, but the scheduling, the paperwork and the willingness to say “no, we cannot make that date” before you commit are what actually protect the transaction. We would rather turn a job down on Tuesday than miss an objection deadline on Friday.

The Deadline Is the Job

Radon in a transaction is not a technical problem, it is a scheduling one. The measurement takes the same 48 hours it always does. What changes is that the Colorado purchase contract runs inspection and objection on fixed dates, those dates do not move because a contractor is busy, and everything downstream of the result — a quote, an install, a retest, a document in the file — has to fit inside them. So the first question we ask is your objection date, and if we cannot make it we would far rather say so on the phone than take the booking and find out on Friday.

Tamper Recording, and Why It Matters Here

In a transaction the result has to convince somebody who is on the other side of a negotiation from you. A continuous monitor logs hourly and records movement and sudden ventilation changes, which means a result can be defended if it is questioned. A charcoal kit sitting on a shelf in a house that is being shown three times a day cannot. The monitor is not more accurate in some laboratory sense; it is more accountable, and accountability is what a transaction is buying.

Testing a House That Is Still Being Shown

This is the practical headache. Closed-house conditions and an open house are contradictory instructions, and the listing agent, the seller and anyone with lockbox access all need to know a test is running. We put a notice on the monitor. It is not enforcement, but it converts an argument later into a conversation now, and combined with tamper logging it usually keeps the result clean.

The Listing Says It Already Has a System

Test it anyway. This is the case most often skipped and it is the one that costs money. A system on the wall proves somebody installed a pipe at some point, not that the house reads low today. Fans fail silently and nobody notices; gauges go unread for a decade; an addition gets built over the original suction point. A short test either confirms it is doing its job or finds a dead fan while it is still the seller's problem rather than yours.

Who Pays, and What We Will Not Advise On

Whether the seller mitigates, whether there is a credit at closing, or whether the buyer takes it on is negotiated between the parties with their agents. We do not have a view on that and we will not pretend to. What we can do is give you a real number quickly, which is usually the piece everyone is waiting on, and then install a system and retest it fast enough that the file closes with a documented before and after.

How long does it take? 48 hours of measurement. Where a system is needed inside the same window, most installs go in within a day once scheduled — the constraint is the calendar, not the work.

Questions People Ask First

Who normally pays for the test and the system?
It is negotiated, not fixed — sometimes the seller mitigates, sometimes there is a credit at closing, sometimes the buyer takes it on. That is a conversation for you and your agent. What we can do is give you a real number quickly enough to be useful in it, which is usually the part holding everything up.
The listing says there is already a system. Do we still test?
Yes, and this is the case we see abandoned most often. A system proves somebody installed a pipe, not that the house reads low today. Fans fail silently, gauges get ignored for a decade, and additions get built over suction points. A short test is cheap and it either confirms the system works or finds a dead fan before you own it.
Can a test be done while the house is occupied and showing?
It can, and the risk is obvious: closed-house conditions and a stream of showings do not mix. Everyone involved has to know the test is running. A monitor that logs tampering and sudden ventilation changes is what makes the result defensible if somebody questions it later.
How fast can you turn one around?
The 48 hours is physics and cannot be compressed. Everything around it — how soon we can place it, how soon you get the report, how soon a system could follow — depends on the week. Tell us your objection date when you first call and you will get a straight answer rather than an optimistic one.
Does a mitigation system hurt the resale value?
The market treats a documented system with a low post-install reading as a solved problem, not a defect. The thing that actually costs sellers money is an unresolved high reading discovered late, when there is no longer time to do anything about it except discount.

Related Services

These usually come up in the same conversation:

Free · No Obligation

Get Your Free Estimate

Send a few details and we will call you back to book a free on-site estimate.

  • Free estimates, given at the house
  • Price approved by you before any work starts
  • Post-mitigation retest included with every system
  • We will tell you if your reading does not need a system

Call Now · (720) 677-9523

Request a Free Estimate

Working to an inspection deadline? Call (720) 677-9523 — objection dates do not move.

Got it — thank you.

We will call you shortly to book the estimate. Need us sooner? (720) 677-9523